CAPABILITIES
ELECTRICAL WORKSHOP
- Floor Space: 1048 square meters
- 2 x 5T Eilbeck ABUS Overhead Crane
- 16T Eilbeck ABUS Overhead Crane
- Fenced Off Test Bay Area
CAPABILITIES
- Burnout Oven
- Wash Down Bay
- Lathe
- Welding Machines
- Varnish Tank
- Laser Alignment Machine
- 3T Table Top Delivery Truck
- Samatic 2680 Automatic Winding Machine
- Pick up and delivery via Arrow trucks and utes
- Grit Blaster Unit
- Spray Booth
- Drill Press
- Forklift – 2T
- Compressor
- Electronic Testing and Tagging Machine
- Pressure Testing Facilities
RESOURCES
Permanent Workforce:
- Workshop Manager – (1)
- Contracts Manager – (1)
- Contracts Supervisor – (1)
- Workshop Supervisor – (1)
- Leading Hands – (3)
- Tradespeople – (14)
- Apprentices – (1)
Arrow Electrical Services can also provide specialist engineering services.
MINING WORKSHOP
Floor Space: 250 square meters (Dedicated to building and overhauling electrical mining equipment)
- 16T Eilbeck ABUS Overhead Crane
- Fenced Off Test Bay Area
CAPABILITIES
- Pressure Testing Facilities
- Dedicated Approvals Room with Machined calibrations table, master/working instrument lockers for AS/NZS3800 overhauls work.
- Certified to MP87.2 incorporating AS/NZS 3800 & AS/NZS 2290.1
- Pre-Overhaul, Overhaul & Repair 0f:
Type of Protection Ex ‘d’
– Flameproof enclosures including electrical equipment installed within an enclosure rated up to and including 11kV – Group I only
– AC rotating machines up to and including 3.3kV, 315kW – Group I & II only – DC rotating machines up to and including 440V, 210kW – Group I & II onlyType of Protection Ex ‘e’
– Increased safety enclosures including electrical equipment installed within an enclosure rated up to and including 1kV – Group I only
– AC rotating machines up to and including 415V, 220kW – Group I & II onlyType of Protection Ex ‘n’
– AC rotating machines up to and including 415V, 220kW – Group I & II onlyType of Protection Ex ‘t’ (DIP)
– AC rotating machines up to and including 3.3kV, 700kW – Group III only
- High Voltage test supplies for full operations testing of 11KV and 6.6KV equipment
- High current 1000v and 415V supplies available for operations testing of machinery
- Hi-pot / Megger testers for applications up to 80KV
- Various variable AC and DC test supplied for control circuit testing
- Earth leakage test equipment to record trip times and levels
- Earth continuity test equipment to record EC trip levels and times
- Current injection trip time tester for overloads and circuit-breakers. Current injection testing up to 3000A
- Level 1 ASP Service Provider – Cat 1-2-3 & 4 – Grade B
- Level 2 ASP Service Provider – Grade B
- Carry out Australian Standards Audits on equipment for the coal mining industry
- Pick up and delivery via Arrow trucks and utes
RESOURCES
Permanent Workforce:
- Mining Manager – (1)
- Mining Supervisor – (1)
- Mining Foreman – (1)
- Leading Hands – (2)
- Tradespeople – (14)
- Apprentices – (3)
Field service personnel including certified competent electrical tradespeople for work on group 1 & 11 explosion protected equipment, including repairs, pre-overhaul audits and internal/external electrical inspections to current mining standards.
Arrow Electrical Services can also provide specialist engineering services.